Project Portfolio

Cold Gas Facility Upgrade

Cold Gas Facility Upgrade


Fabrication and construction for installation of cold gas separators and heat exchangers for South Louisian midstream client.

Man Hours: 20,000   Duration: 4 Months

Cold Gas Facility Upgrade
Cooler Expansion Project

Cooler Expansion Project


Fabrication, installation, coatings and instrumentation and electrical work for cooler expansion, civil preparation and interconnect piping for South Louisiana midstream client.

Man hours: 120,000    Duration: 14 Months

Corrosion Field Maintenance

Corrosion Field Maintenance


PERMIAN BASIN MAJOR OPERATOR

Installed cathodic protection cathodes and anodes to update current system and performed maintenance coatings to areas of coating failure and rust break out on upon completion of cathodic protection system update.

Duration: 2 Months

Decommissioning

Decommissioning


Provided plug and abandonment campaign support for Gulf of Mexico facility.

Man hours: 135,000     Duration: 24 months

Download the full project sheet

Decommissioning
Decommissioning

Decommissioning


Provided plug and abandonment campaign support for Gulf of Mexico major operator.

Duration: 36 months

Download the full project sheet.

Ethane Booster Station

Ethane Booster Station


Onshore installation of three new ethane booster pump stations and one new metering station with launcher / receiver package for South Texas midstream client.

Man hours: 50,000   Duration: 7 Months

Download the full project sheet.

FSPO Facility Upgrade

FSPO Facility Upgrade


Fabrication, installation, coatings and shore base support on facility upgrade to bring project to full compliance - offshore Gulf of Mexico

Man Hours: 180,000     Duration: 15 months

Hook Up and Commissioning

Hook Up and Commissioning


Topsides completion and hook up and commissioning of new deepwater Gulf of Mexico production platform 

Man hours: 600,000      Duration: 12 months

Download the full project sheet

Hook Up and Commissioning
Major Facility Control System Expansion

Major Facility Control System Expansion


Onshore operations

Automation systems integration - design, fabrication, integraiton, installation and commissioning of new plan control system equipment

Duration: 2 weeks

Download the project sheet.

New Ethane Booster Station

New Ethane Booster Station


Installation of two 400HP pumps and power distribution center building. Provided associated civil work, fabrication, piping installation, electrical hook up and final commissioning. South Louisiana midstream client

Man hours: 20,000     Duration: 4 Months

Download the full project sheet.

New Facility Build

New Facility Build


Onshore Permian Basin operator

Installation and construction of 5,000 barrel hydrocarbon storage transfer facility with water transfer pumps, LACT oil metering system and gas injection facility

Duration: 6 months

Download the project sheet.

New Facility Rail to Pipeline

New Facility Rail to Pipeline


New facility Instrumentation and electrical

South Louisiana midstream client

Project management, pre-commissioning, commissioning and complete instrumentation and electrical installation, MV, LV, PLC and communications

Duration: 13 months

Download the full project sheet.

Offshore Platform Coatings Program

Offshore Platform Coatings Program


Deep water Gulf of Mexico major operator

Initial project management and support of work pack development for offshore scope of over 75,000 SQFT of hull column rehabilitation painting and 25,000 SQFT of deck

Man hours: 41,000

Duration: 8 Months

Offshore Platform Hull Column Coatings

Offshore Platform Hull Column Coatings


Deep water Gulf of Mexico major operator

Initial Project Management and support of work pack development for offshore scope of over 50,000 SQFT of hull column rehabilitation painting.

Man hours: 26,500

Duration: 4 Months

PSV Modification

PSV Modification


Assembled and erected a new 110' vent stack, power and controls to CO2 snuffing system unit for North Carolina midstream client.

Man hours: 23,000    Duration: 5 months

Download the full project sheet.

Saltwater Disposal Expansion

Saltwater Disposal Expansion


Onshore Permian Basin

Construct, build and re-build public saltwater disposal injection and storage facility.

Duration: 2 months

Download the full project sheet.

Scraper Trap Project

Scraper Trap Project


Fabrication, construction, and installation of skids, interconnect piping and deck extension for offshore Gulf of Mexico major operator.

Man hours: 70,000     Duration: 8 Months

Download the full project sheet.

Slug Catcher Piping Repair

Slug Catcher Piping Repair


Onshore repair and protective coating of slug catcher piping.

Man hours: 20,000     Duration: 3 Months

Download the project sheet.

Slug Catcher Repair

Slug Catcher Repair


South Louisiana midstream client

Slug catcher repair, facility upgrades and maintenance

Duration: 9 months

Slug Catcher Repair
Solar Farm Maintenance

Solar Farm Maintenance


Reattached cable ties on facility.

Duration: 2 weeks

Download the full project sheet.

Rope Access

Rope Access


Gulf of Mexico major shelf operator

Performed rigging, fitting, welding, coating and NDT services to repair/replace a series of pipeline riser supports

 

Natural Gas Production Processing Plant Turnaround

Natural Gas Production Processing Plant Turnaround


Danos’ Project Management team assisted client from beginning to end of their turnaround: from identifying and planning the work to training and mobilizing the workforce to safely brining the plant back online. Services provided: Project Management, Construction, Instrumentation & Electrical

Duration: 30 days     Manpower: 102

Download the project sheet.

LNG Plant Turnaround

LNG Plant Turnaround


Onshore LNG Liquefaction Plant Turnaround
Capacity: 700 MMSCFD input gas

Danos’ project management team assisted the client from beginning to end of the turnaround: from identifying and planning the work to training and mobilizing the workforce to safely bringing the plant back online. 

Duration: 15 days     Peak manpower:88

Download the full project sheet.

Nature-based Pipeline Protection

Nature-based Pipeline Protection


Installation of Natrx's Cajun Coral for pipeline infrastructure protection & resilience.

Download the full project sheet.

Nature-based Pipeline Protection
Island Road Marsh Stabilization

Island Road Marsh Stabilization


Installation of Cajun Coral and Oysterbreak for marsh stabilization and infrastructure protection of the low-lying, at-risk community of Point Aux Chenes.

PIcture Rock Solar

PIcture Rock Solar


14,000 terminations and cable installation

DEPCOM Solar Farm

DEPCOM Solar Farm


Welding inspection

Hunter Solar Farm

Hunter Solar Farm


Cable re-routing and cable management for 150,000 modules

Avalon 2 Solar Farm

Avalon 2 Solar Farm


Cable re-routing and maintenance

Taygete 1 Solar Farm

Taygete 1 Solar Farm


Cable re-routing and cable management for 700,000 modules

Buckhorn Solar Farm

Buckhorn Solar Farm


Module removal and replacement

Hook Up and Commissioning

Hook Up and Commissioning


Project management and execution planning for topsides hook up and commissioning of new deepwater facility in the Gulf of Mexico

Download the full project sheet.

Hook Up and Commissioning
Danos Reveals Artificial Reef in Timbalier Bay

Danos Reveals Artificial Reef in Timbalier Bay


Danos recently completed the installation of a new artificial reef in Timbalier Bay, LA. The objective is to revive the current fish population, benefiting local recreational anglers. This collaborative project was made possible through the support of Chevron, Natrx and the Coastal Conservation Association (CCA).

Click here to view the photos.

Danos Foundation
The Danos Foundation impacts and improves the communities where we live and work by mirroring the Purpose and Values of Danos. Within the guidelines of the Foundation’s Purpose and Values, we leverage our resources of time, talent and money to support and promote involvement in activities and initiatives to help resolve community challenges and make a difference in the lives of people.